![Geotechnical Construction](http://www.beaverexcavating.com/wp-content/uploads/2018/09/20160928_104034-Mike-Culb-Amos-1.jpg)
![Geotechnical Construction](http://www.beaverexcavating.com/wp-content/uploads/2018/06/Wellington-Tangent-Pile-Wall-small-1.jpg)
![Geotechnical Construction](http://www.beaverexcavating.com/wp-content/uploads/2018/09/SR-58-Wellington-Underpass.jpg)
![Geotechnical Construction](http://www.beaverexcavating.com/wp-content/uploads/2018/09/Pat-Keith-Amos-7-8-16-IMG_8645.jpg)
![Geotechnical Construction](http://www.beaverexcavating.com/wp-content/uploads/2018/06/DSC_0111-1.jpg)
![Columbia Parkway area 1-3](http://www.beaverexcavating.com/wp-content/uploads/2022/01/Columbia-Parkway-area-1-3-scaled-e1641589145488.jpg)
GEOTECHNICAL CONSTRUCTION
Beaver Excavating is focused on delivering a complete line of services and capabilities to address our customers’ site and civil construction needs. Through a diverse line of geotechnical construction services, and a wide range of project delivery methods, Beaver can offer a single-source solution for your foundation construction, earth retention, slope stability, and ground modification needs.
- Deep Foundation Construction and Repair:
- CFA – Continuous auger cast piles (up to 48”)
- Low headroom capabilities
- Driven piles (H-pile, wood piles, and pipe piles)
- Drilled shafts (up to 144″)
- Helical piles
- Micropiles (up to 12”)
- Low headroom capabilities
- Underpinning
- CFA – Continuous auger cast piles (up to 48”)
- Earth Retention / Slope Stability Construction and Repair:
- Internal bracing for earth retention
- Reinforced earth retaining walls (block, wire basket, MSE)
- Plug pile walls
- Micropiles (up to 12″)
- Low headroom capabilities
- Secant and Tangent piles
- Soil nails
- Shotcrete
- High tension mesh
- Soldier pile and lagging
- Sheet pile
- Tiebacks
- Ground Improvements:
- Deep dynamic compaction (DDC)
- Grouting (injection, chemical, compaction, permeation, urethane)
- Mine grouting
- Rigid inclusions
- Stone columns
- Vibro compaction