ODOT I-77/S.R. 30 Interchange Reconstruction
ODOT I-77/S.R. 30 Interchange Reconstruction, Stark County, Ohio
LOCATION
Stark County, Ohio
Project Highlights
- 10,500 cy of structural concrete
- 1,540,000 lb of reinforcing steel
- Approximately 5.5 million lbs of structural steel with beam depths up to 9.5 ft
- 5,255 lf of 48" drilled shaft foundations
- 7,800 lf of 18" auger cast piles with cages
- 13,000 lf of 24" auger cast piles with beams
- 4 drilled shaft dynamic tests
- 7,000 cy of engineered lightweight concrete fill
- 54,000 cy of excavation
- 15,280 cy of dump rock fill
- 460 lf of 72" sanitary sewer with three cast-in-place chamber/manhole structures
- 5 temporary creek access fills
- Wellpoint dewatering system
- 48,000 lf of portable concrete traffic barrier
- 4,000 cy of roadway aggregate base
Project Description
Reconstruction of the I-77 and S.R. 30 Interchange including full reconstruction of two bridges and foundations, one complete bridge re-decking with abutment work, rehabilitation of 11 sets of bridges, 72″ sanitary sewer relocation, extensive dewatering, geotechnical foundation and retaining wall construction including drilled shafts, auger cast piles, and tie-backs, excavation, demolition, lightweight engineered concrete fill, and stream flow management.
Related Projects
Columbus UpGround Water Reservoir-Richwood, Ohio
AES/AEP Power Plant Expansion-Maidsville, WV
ODOT S.R. 8/271 Interchange Reconstruction-Summit County, OH
Tanger Outlet Center-Pittsburgh, PA
Timken Underpass Bridge Construction-Canton, Ohio
ODOT S.R. 58 Railroad Grade Separation-Wellington, Ohio
ODOT S.R. 7 Slope Excavation-Jefferson County, Ohio
ODOT US Route 33 Bypass Construction, Phase III-Nelsonville, Ohio
Marysville UpGround Water Reservoir-Marysville, Ohio
Jumbo Bloom Vertical Caster Foundations-Canton, Ohio