ODOT I-70 Bridge Replacements


ODOT I-70 Bridge Replacements, St. Clairsville, Ohio


LOCATION

St. Clairsville, Ohio

Project Highlights
  • 6 phase maintenance of traffic on I-70
  • Demolition of 4 structures
  • Construction of 4 new bridge structures
  • Construction of one 245 foot 10' x 6' box culvert
  • 184 feet of bikeway tunnel construction
  • 45,000 cy excavation
  • 446 lf of 24" drilled shafts
  • 1,300 lf of 30" drilled shafts
  • 3,011 cy of cast-in-place concrete
  • 3,516 sf of temporary MSE wall
Project Description

Improvement of 0.7 miles of I-70 with replacement of structures BEL-70-1817 over State Route 9 and replacement of structures BEL-70-1793 over the National Road Bikeway in St. Clairsville, Ohio.