Improvement of 0.7 miles of I-70 with replacement of structures BEL-70-1817 over State Route 9 and replacement of structures BEL-70-1793 over the National Road Bikeway in St. Clairsville, Ohio.
ODOT I-70 Bridge Replacements
St. Clairsville, Ohio
Project Description
Project Highlights
- 6 phase maintenance of traffic on I-70
- Demolition of 4 structures
- Construction of 4 new bridge structures
- Construction of one 245 foot 10′ x 6′ box culvert
- 184 feet of bikeway tunnel construction
- 45,000 cy excavation
- 446 lf of 24″ drilled shafts
- 1,300 lf of 30″ drilled shafts
- 3,011 cy of cast-in-place concrete
- 3,516 sf of temporary MSE wall